2027 Admission Run

TIMELINE

This page turns the repo's admissions plan into a vertical week-by-week execution board, starting from the week of March 23, 2026 and ending when one 2027 admission is operationally secured.

Week-by-week actionsVertical planning viewAuto-jumps to the current week
March 2026
Mar 23-29, 2026

Audit the active shortlist

Upcoming
Phase · Plan lock Week 1

Lock the shortlist, cost logic, and keep or drop rules before the file-building work begins.

Main action

Review every school against language, cost, timing, and scholarship dependence.

Support

Remove any route that is expensive without a believable funding path.

Deliverable

A clean keep or drop table in the tracker.

Milestone
Kickoff

Timeline starts from the current planning week.

1
Mar 30-Apr 5, 2026

Set the family decision rules

Upcoming
Phase · Plan lock Week 2

Lock the shortlist, cost logic, and keep or drop rules before the file-building work begins.

Main action

Fix the budget ceiling, acceptable countries, and what counts as a core school versus a hedge.

Support

Write the rules down instead of keeping them as informal preferences.

Deliverable

One signed-off decision memo for the 2027 cycle.

2
April 2026
Apr 6-12, 2026

Sort schools into layers

Upcoming
Phase · Plan lock Week 3

Lock the shortlist, cost logic, and keep or drop rules before the file-building work begins.

Main action

Separate low-fee anchors from scholarship-first upside lanes.

Support

Mark which routes can be pursued only if extra proof or funding appears.

Deliverable

A layered shortlist with clear priorities.

3
Apr 13-19, 2026

Build the operating tracker

Upcoming
Phase · Plan lock Week 4

Lock the shortlist, cost logic, and keep or drop rules before the file-building work begins.

Main action

Create fields for deadlines, tests, documents, portal status, and decision notes.

Support

Link each school to one current owner and one verification owner.

Deliverable

A working tracker that can carry the whole cycle.

4
Apr 20-26, 2026

Run the first plan review

Upcoming
Phase · Plan lock Week 5

Lock the shortlist, cost logic, and keep or drop rules before the file-building work begins.

Main action

Check whether the shortlist still matches the student profile, timing, and family budget.

Support

Do one last pass before moving into testing and document work.

Deliverable

Shortlist lock for the next execution phase.

Milestone
Shortlist locked

No new school enters unless it beats the current structure.

5
Apr 27-May 3, 2026

Verify legal identity details

Upcoming
Phase · Identity + testing Week 6

Make the formal identity layer and test plan real before grade-11 evidence starts closing.

Main action

Check passport name, expiry date, school name format, and the grading-system notes.

Support

Make sure every later portal uses the same legal identity wording.

Deliverable

A clean identity sheet plus passport scan.

6
May 2026
May 4-10, 2026

Ask the school about future documents

Upcoming
Phase · Identity + testing Week 7

Make the formal identity layer and test plan real before grade-11 evidence starts closing.

Main action

Confirm whether predicted grades, expected graduation letters, or official grade-11 records can be issued.

Support

Document who at school owns each letter or transcript request.

Deliverable

A school-document pipeline with named contacts.

7
May 11-17, 2026

Lock the test strategy

Upcoming
Phase · Identity + testing Week 8

Make the formal identity layer and test plan real before grade-11 evidence starts closing.

Main action

Choose IELTS or TOEFL and decide whether SAT or TestAS stays active.

Support

Book early enough to leave room for one retake if needed.

Deliverable

A dated test plan with target scores.

Milestone
School pipeline check

Predicted-grade and transcript answers should be known by now.

8
May 18-24, 2026

Verify legal identity details

Upcoming
Phase · Identity + testing Week 9

Make the formal identity layer and test plan real before grade-11 evidence starts closing.

Main action

Check passport name, expiry date, school name format, and the grading-system notes.

Support

Make sure every later portal uses the same legal identity wording.

Deliverable

A clean identity sheet plus passport scan.

9
May 25-31, 2026

Ask the school about future documents

Upcoming
Phase · Identity + testing Week 10

Make the formal identity layer and test plan real before grade-11 evidence starts closing.

Main action

Confirm whether predicted grades, expected graduation letters, or official grade-11 records can be issued.

Support

Document who at school owns each letter or transcript request.

Deliverable

A school-document pipeline with named contacts.

10
June 2026
Jun 1-7, 2026

Lock the test strategy

Upcoming
Phase · Identity + testing Week 11

Make the formal identity layer and test plan real before grade-11 evidence starts closing.

Main action

Choose IELTS or TOEFL and decide whether SAT or TestAS stays active.

Support

Book early enough to leave room for one retake if needed.

Deliverable

A dated test plan with target scores.

Milestone
First booking point

Testing dates should already be reserved, not just discussed.

11
Jun 8-14, 2026

Organize awards and certificates

Upcoming
Phase · Evidence pack Week 12

Turn school records, awards, projects, and internship signals into reusable admissions evidence.

Main action

Sort competition, school-honor, and outside-award documents into one evidence folder.

Support

Rename files clearly so later reviewers do not waste time decoding them.

Deliverable

Awards pack ready for CV and portal use.

12
Jun 15-21, 2026

Clean the project archive

Upcoming
Phase · Evidence pack Week 13

Turn school records, awards, projects, and internship signals into reusable admissions evidence.

Main action

Pull GitHub links, project screenshots, demos, and short technical descriptions into one place.

Support

Keep only projects that can survive admissions review.

Deliverable

Project evidence set with links and proof.

13
Jun 22-28, 2026

Draft the activity record

Upcoming
Phase · Evidence pack Week 14

Turn school records, awards, projects, and internship signals into reusable admissions evidence.

Main action

Write a one-page CV and a separate activities list with dates, roles, and outcomes.

Support

Use verified proof instead of inflated claims or vague wording.

Deliverable

CV v1 plus activity inventory.

Milestone
Grade 11 closes

Request the grade-11 record path as soon as the school cycle finishes.

14
Jun 29-Jul 5, 2026

Capture current-work evidence

Upcoming
Phase · Evidence pack Week 15

Turn school records, awards, projects, and internship signals into reusable admissions evidence.

Main action

Record internship or technical-work details while they are still fresh and documentable.

Support

Store proof links, dates, and outputs even if the public description stays short.

Deliverable

Internship evidence notes folded into the main pack.

15
July 2026
Jul 6-12, 2026

Organize awards and certificates

Upcoming
Phase · Evidence pack Week 16

Turn school records, awards, projects, and internship signals into reusable admissions evidence.

Main action

Sort competition, school-honor, and outside-award documents into one evidence folder.

Support

Rename files clearly so later reviewers do not waste time decoding them.

Deliverable

Awards pack ready for CV and portal use.

16
Jul 13-19, 2026

Clean the project archive

Upcoming
Phase · Evidence pack Week 17

Turn school records, awards, projects, and internship signals into reusable admissions evidence.

Main action

Pull GitHub links, project screenshots, demos, and short technical descriptions into one place.

Support

Keep only projects that can survive admissions review.

Deliverable

Project evidence set with links and proof.

17
Jul 20-26, 2026

Draft the activity record

Upcoming
Phase · Evidence pack Week 18

Turn school records, awards, projects, and internship signals into reusable admissions evidence.

Main action

Write a one-page CV and a separate activities list with dates, roles, and outcomes.

Support

Use verified proof instead of inflated claims or vague wording.

Deliverable

CV v1 plus activity inventory.

Milestone
Evidence pack v1

The first usable proof stack should be complete this week.

18
Jul 27-Aug 2, 2026

Capture current-work evidence

Upcoming
Phase · Evidence pack Week 19

Turn school records, awards, projects, and internship signals into reusable admissions evidence.

Main action

Record internship or technical-work details while they are still fresh and documentable.

Support

Store proof links, dates, and outputs even if the public description stays short.

Deliverable

Internship evidence notes folded into the main pack.

19
August 2026
Aug 3-9, 2026

Choose recommenders

Upcoming
Phase · Recommenders + writing Week 20

The aim here is to stop September from collapsing into document chaos.

Main action

Confirm 2 to 3 people who can write or support references in English.

Support

Give them dates, expected themes, and enough lead time.

Deliverable

Named recommender list with contact and timeline.

20
Aug 10-16, 2026

Prepare translation-ready records

Upcoming
Phase · Recommenders + writing Week 21

The aim here is to stop September from collapsing into document chaos.

Main action

Assemble the school documents that may need certification or translation.

Support

Check format requirements before paying for any official translation work.

Deliverable

Translation queue with clean source files.

21
Aug 17-23, 2026

Draft the core writing bank

Upcoming
Phase · Recommenders + writing Week 22

The aim here is to stop September from collapsing into document chaos.

Main action

Write the master personal statement, shorter motivation version, and scholarship paragraph bank.

Support

Keep a reusable base while still leaving room for school-specific tailoring.

Deliverable

Writing kit v1 for the first application wave.

Milestone
Recommenders locked

Reference owners should be confirmed by mid-August.

22
Aug 24-30, 2026

Choose recommenders

Upcoming
Phase · Recommenders + writing Week 23

The aim here is to stop September from collapsing into document chaos.

Main action

Confirm 2 to 3 people who can write or support references in English.

Support

Give them dates, expected themes, and enough lead time.

Deliverable

Named recommender list with contact and timeline.

23
Aug 31-Sep 6, 2026

Prepare translation-ready records

Upcoming
Phase · Recommenders + writing Week 24

The aim here is to stop September from collapsing into document chaos.

Main action

Assemble the school documents that may need certification or translation.

Support

Check format requirements before paying for any official translation work.

Deliverable

Translation queue with clean source files.

24
September 2026
Sep 7-13, 2026

Draft the core writing bank

Upcoming
Phase · Recommenders + writing Week 25

The aim here is to stop September from collapsing into document chaos.

Main action

Write the master personal statement, shorter motivation version, and scholarship paragraph bank.

Support

Keep a reusable base while still leaving room for school-specific tailoring.

Deliverable

Writing kit v1 for the first application wave.

Milestone
Writing kit ready

The reusable essay and motivation base should be usable this week.

25
Sep 14-20, 2026

Open portals and accounts

Upcoming
Phase · Early-cycle launch Week 26

France and Hong Kong are the earliest practical motion in the current verified structure.

Main action

Create all portal logins, recovery details, and shared tracking records.

Support

Do not wait for the final day to discover account or format issues.

Deliverable

Live accounts for every early-cycle school.

26
Sep 21-27, 2026

Push the France-facing work

Upcoming
Phase · Early-cycle launch Week 27

France and Hong Kong are the earliest practical motion in the current verified structure.

Main action

Advance the France dossier and any Polytechnique-first material that can move early.

Support

Keep French-lane paperwork separate from the January wave.

Deliverable

France package in active review or submission.

Milestone
Accounts live

All early-round portals should be open and tested.

27
Sep 28-Oct 4, 2026

Start the Hong Kong early assets

Upcoming
Phase · Early-cycle launch Week 28

France and Hong Kong are the earliest practical motion in the current verified structure.

Main action

Prepare HKUST and CUHK files, especially the scholarship-facing story and proof pack.

Support

Make sure the student profile, awards, and CV all tell the same story.

Deliverable

Hong Kong early-round package ready for filing.

28
October 2026
Oct 5-11, 2026

Open portals and accounts

Upcoming
Phase · Early-cycle launch Week 29

France and Hong Kong are the earliest practical motion in the current verified structure.

Main action

Create all portal logins, recovery details, and shared tracking records.

Support

Do not wait for the final day to discover account or format issues.

Deliverable

Live accounts for every early-cycle school.

29
Oct 12-18, 2026

Push the France-facing work

Upcoming
Phase · Early-cycle launch Week 30

France and Hong Kong are the earliest practical motion in the current verified structure.

Main action

Advance the France dossier and any Polytechnique-first material that can move early.

Support

Keep French-lane paperwork separate from the January wave.

Deliverable

France package in active review or submission.

Milestone
Early wave in motion

France and Hong Kong should no longer be sitting at draft stage.

30
Oct 19-25, 2026

Start the Hong Kong early assets

Upcoming
Phase · Early-cycle launch Week 31

France and Hong Kong are the earliest practical motion in the current verified structure.

Main action

Prepare HKUST and CUHK files, especially the scholarship-facing story and proof pack.

Support

Make sure the student profile, awards, and CV all tell the same story.

Deliverable

Hong Kong early-round package ready for filing.

31
Oct 26-Nov 1, 2026

Sharpen the scholarship case

Upcoming
Phase · Portfolio tightening Week 32

This phase closes testing, sharpens the scholarship narrative, and removes avoidable January friction.

Main action

Tighten activity descriptions, proof references, and the strongest academic-identity lines.

Support

Cut weak claims that do not materially help the case.

Deliverable

A cleaner scholarship-facing application story.

32
November 2026
Nov 2-8, 2026

Close testing and retakes

Upcoming
Phase · Portfolio tightening Week 33

This phase closes testing, sharpens the scholarship narrative, and removes avoidable January friction.

Main action

Finish any final IELTS, TOEFL, SAT, or TestAS work that still matters.

Support

Move scores into the tracker as soon as they are released.

Deliverable

Final usable test results on file.

33
Nov 9-15, 2026

Run January-readiness review

Upcoming
Phase · Portfolio tightening Week 34

This phase closes testing, sharpens the scholarship narrative, and removes avoidable January friction.

Main action

Check essays, references, translations, and file names against the schools that peak in January.

Support

Treat every missing attachment as a blocking issue now, not later.

Deliverable

January-ready application stack.

Milestone
Advance-offer pressure point

Hong Kong and other early-round work should be submission-grade by this week.

34
Nov 16-22, 2026

Sharpen the scholarship case

Upcoming
Phase · Portfolio tightening Week 35

This phase closes testing, sharpens the scholarship narrative, and removes avoidable January friction.

Main action

Tighten activity descriptions, proof references, and the strongest academic-identity lines.

Support

Cut weak claims that do not materially help the case.

Deliverable

A cleaner scholarship-facing application story.

35
Nov 23-29, 2026

Close testing and retakes

Upcoming
Phase · Portfolio tightening Week 36

This phase closes testing, sharpens the scholarship narrative, and removes avoidable January friction.

Main action

Finish any final IELTS, TOEFL, SAT, or TestAS work that still matters.

Support

Move scores into the tracker as soon as they are released.

Deliverable

Final usable test results on file.

36
Nov 30-Dec 6, 2026

Run January-readiness review

Upcoming
Phase · Portfolio tightening Week 37

This phase closes testing, sharpens the scholarship narrative, and removes avoidable January friction.

Main action

Check essays, references, translations, and file names against the schools that peak in January.

Support

Treat every missing attachment as a blocking issue now, not later.

Deliverable

January-ready application stack.

Milestone
January pack frozen

The main-round file should be stable enough for final QA.

37
December 2026
Dec 7-13, 2026

Run final QA

Upcoming
Phase · January wave Week 38

This is the peak operational phase for Finland, Hong Kong main rounds, and the big portal push.

Main action

Check every form, attachment, recommender step, and file label before submission.

Support

Use one last proofread pass on names, dates, and portal answers.

Deliverable

Submission-ready packets without loose ends.

38
Dec 14-20, 2026

File the main applications

Upcoming
Phase · January wave Week 39

This is the peak operational phase for Finland, Hong Kong main rounds, and the big portal push.

Main action

Submit the big January-round schools and archive confirmation evidence immediately.

Support

Save screenshots, receipts, and portal timestamps the same day.

Deliverable

Main-round applications formally filed.

39
Dec 21-27, 2026

Clear post-submission gaps

Upcoming
Phase · January wave Week 40

This is the peak operational phase for Finland, Hong Kong main rounds, and the big portal push.

Main action

Fix attachment warnings, missing items, or portal flags as soon as they appear.

Support

Do not let admin follow-up slip into silence after submission.

Deliverable

A clean log of all filed applications and follow-up items.

40
Dec 28, 2026-Jan 3, 2027

Run final QA

Upcoming
Phase · January wave Week 41

This is the peak operational phase for Finland, Hong Kong main rounds, and the big portal push.

Main action

Check every form, attachment, recommender step, and file label before submission.

Support

Use one last proofread pass on names, dates, and portal answers.

Deliverable

Submission-ready packets without loose ends.

41
January 2027
Jan 4-10, 2027

File the main applications

Upcoming
Phase · January wave Week 42

This is the peak operational phase for Finland, Hong Kong main rounds, and the big portal push.

Main action

Submit the big January-round schools and archive confirmation evidence immediately.

Support

Save screenshots, receipts, and portal timestamps the same day.

Deliverable

Main-round applications formally filed.

Milestone
Main filing week

The biggest applications should be going out this week.

42
Jan 11-17, 2027

Clear post-submission gaps

Upcoming
Phase · January wave Week 43

This is the peak operational phase for Finland, Hong Kong main rounds, and the big portal push.

Main action

Fix attachment warnings, missing items, or portal flags as soon as they appear.

Support

Do not let admin follow-up slip into silence after submission.

Deliverable

A clean log of all filed applications and follow-up items.

Milestone
Confirmations saved

Every January submission should already have proof archived.

43
Jan 18-24, 2027

Close missing-document requests

Upcoming
Phase · Follow-up + interviews Week 44

This phase is about staying responsive after the submission rush instead of going passive.

Main action

Answer every portal note about predicted grades, references, or attachment quality.

Support

Escalate to school or family immediately when an official document is missing.

Deliverable

No open admin blockers on active applications.

44
Jan 25-31, 2027

Prepare interviews and assessments

Upcoming
Phase · Follow-up + interviews Week 45

This phase is about staying responsive after the submission rush instead of going passive.

Main action

Build answers around the student's real story, projects, and school record.

Support

Practice concise evidence-based responses instead of generic motivation talk.

Deliverable

Interview-prep pack plus speaking notes.

45
February 2027
Feb 1-7, 2027

Decide on extra lanes

Upcoming
Phase · Follow-up + interviews Week 46

This phase is about staying responsive after the submission rush instead of going passive.

Main action

Confirm whether JKU, Hungary, or any secondary path still deserves real work.

Support

Drop weak lanes instead of half-maintaining them.

Deliverable

A yes or no decision on secondary applications.

Milestone
France follow-up point

Remaining France tasks should be in active motion this week.

46
Feb 8-14, 2027

Close missing-document requests

Upcoming
Phase · Follow-up + interviews Week 47

This phase is about staying responsive after the submission rush instead of going passive.

Main action

Answer every portal note about predicted grades, references, or attachment quality.

Support

Escalate to school or family immediately when an official document is missing.

Deliverable

No open admin blockers on active applications.

47
Feb 15-21, 2027

Prepare interviews and assessments

Upcoming
Phase · Follow-up + interviews Week 48

This phase is about staying responsive after the submission rush instead of going passive.

Main action

Build answers around the student's real story, projects, and school record.

Support

Practice concise evidence-based responses instead of generic motivation talk.

Deliverable

Interview-prep pack plus speaking notes.

48
Feb 22-28, 2027

Decide on extra lanes

Upcoming
Phase · Follow-up + interviews Week 49

This phase is about staying responsive after the submission rush instead of going passive.

Main action

Confirm whether JKU, Hungary, or any secondary path still deserves real work.

Support

Drop weak lanes instead of half-maintaining them.

Deliverable

A yes or no decision on secondary applications.

Milestone
Interview pack ready

If interviews appear, preparation should already be done.

49
March 2027
Mar 1-7, 2027

Review portal movement weekly

Upcoming
Phase · Results + school protection Week 50

The main risk here is admissions fatigue hurting grade-12 performance before the final document stage.

Main action

Check every live application for status changes, missing tasks, or interview notes.

Support

Keep the tracker current so the family can react quickly.

Deliverable

A weekly status snapshot across all live schools.

50
Mar 8-14, 2027

Protect classroom performance

Upcoming
Phase · Results + school protection Week 51

The main risk here is admissions fatigue hurting grade-12 performance before the final document stage.

Main action

Keep grade-12 schoolwork stable and treat admissions admin as secondary to final results.

Support

Avoid late-cycle distractions that create transcript damage.

Deliverable

No decline caused by application fatigue.

51
Mar 15-21, 2027

Refresh scholarship positioning

Upcoming
Phase · Results + school protection Week 52

The main risk here is admissions fatigue hurting grade-12 performance before the final document stage.

Main action

Update any school that allows extra proof, improved scores, or clarified achievements.

Support

Only send new evidence that materially strengthens the case.

Deliverable

Scholarship-facing files kept current where allowed.

Milestone
Status review

Run a full family review of live applications and likely outcomes.

52
Mar 22-28, 2027

Build the decision sheet

Upcoming
Phase · Results + school protection Week 53

The main risk here is admissions fatigue hurting grade-12 performance before the final document stage.

Main action

Start comparing cost, offer quality, scholarship logic, and city fit before results cluster.

Support

Write questions down now rather than improvising later.

Deliverable

Offer-comparison sheet ready ahead of decisions.

53
Mar 29-Apr 4, 2027

Review portal movement weekly

Upcoming
Phase · Results + school protection Week 54

The main risk here is admissions fatigue hurting grade-12 performance before the final document stage.

Main action

Check every live application for status changes, missing tasks, or interview notes.

Support

Keep the tracker current so the family can react quickly.

Deliverable

A weekly status snapshot across all live schools.

54
April 2027
Apr 5-11, 2027

Protect classroom performance

Upcoming
Phase · Results + school protection Week 55

The main risk here is admissions fatigue hurting grade-12 performance before the final document stage.

Main action

Keep grade-12 schoolwork stable and treat admissions admin as secondary to final results.

Support

Avoid late-cycle distractions that create transcript damage.

Deliverable

No decline caused by application fatigue.

55
Apr 12-18, 2027

Refresh scholarship positioning

Upcoming
Phase · Results + school protection Week 56

The main risk here is admissions fatigue hurting grade-12 performance before the final document stage.

Main action

Update any school that allows extra proof, improved scores, or clarified achievements.

Support

Only send new evidence that materially strengthens the case.

Deliverable

Scholarship-facing files kept current where allowed.

Milestone
Exam runway starts

Final school performance now becomes the dominant priority.

56
Apr 19-25, 2027

Protect final-exam preparation

Upcoming
Phase · Grade 12 closeout Week 57

This is the bridge between pre-graduation applications and the documents that clear conditional decisions.

Main action

Keep study time dominant and reduce non-essential admissions admin.

Support

Push only the tasks that actually affect live decisions.

Deliverable

Strong final-school performance protected.

57
Apr 26-May 2, 2027

Request official school outputs

Upcoming
Phase · Grade 12 closeout Week 58

This is the bridge between pre-graduation applications and the documents that clear conditional decisions.

Main action

Prepare transcript, graduation, and school-certification requests before the last-minute rush.

Support

Confirm how fast the school can issue each document.

Deliverable

Final-document request path mapped and ready.

58
May 2027
May 3-9, 2027

Queue certified translation work

Upcoming
Phase · Grade 12 closeout Week 59

This is the bridge between pre-graduation applications and the documents that clear conditional decisions.

Main action

Line up notarization, certification, and translation steps for the final school documents.

Support

Avoid waiting until offers arrive to discover document friction.

Deliverable

Translation and certification lane ready to run.

59
May 10-16, 2027

Prepare conditional-offer clearing files

Upcoming
Phase · Grade 12 closeout Week 60

This is the bridge between pre-graduation applications and the documents that clear conditional decisions.

Main action

Match every school's final-document requirement against what will arrive after graduation.

Support

Track exact upload names, deadlines, and accepted formats.

Deliverable

Conditional-offer clearing checklist.

60
May 17-23, 2027

Protect final-exam preparation

Upcoming
Phase · Grade 12 closeout Week 61

This is the bridge between pre-graduation applications and the documents that clear conditional decisions.

Main action

Keep study time dominant and reduce non-essential admissions admin.

Support

Push only the tasks that actually affect live decisions.

Deliverable

Strong final-school performance protected.

61
May 24-30, 2027

Request official school outputs

Upcoming
Phase · Grade 12 closeout Week 62

This is the bridge between pre-graduation applications and the documents that clear conditional decisions.

Main action

Prepare transcript, graduation, and school-certification requests before the last-minute rush.

Support

Confirm how fast the school can issue each document.

Deliverable

Final-document request path mapped and ready.

Milestone
Document-request point

Every final-school document request should already have an owner.

62
May 31-Jun 6, 2027

Queue certified translation work

Upcoming
Phase · Grade 12 closeout Week 63

This is the bridge between pre-graduation applications and the documents that clear conditional decisions.

Main action

Line up notarization, certification, and translation steps for the final school documents.

Support

Avoid waiting until offers arrive to discover document friction.

Deliverable

Translation and certification lane ready to run.

63
June 2027
Jun 7-13, 2027

Prepare conditional-offer clearing files

Upcoming
Phase · Grade 12 closeout Week 64

This is the bridge between pre-graduation applications and the documents that clear conditional decisions.

Main action

Match every school's final-document requirement against what will arrive after graduation.

Support

Track exact upload names, deadlines, and accepted formats.

Deliverable

Conditional-offer clearing checklist.

Milestone
Grade 12 finish line

School completion should now transition into final-document collection.

64
Jun 14-20, 2027

Upload the final school proofs

Upcoming
Phase · After graduation Week 65

This is where conditional decisions become real and the final school choice becomes concrete.

Main action

Send final transcripts, graduation proof, and any cleared conditions to the active schools.

Support

Check upload confirmation instead of assuming receipt.

Deliverable

Conditional offers moved toward final status.

65
Jun 21-27, 2027

Finish after-graduation routes

Upcoming
Phase · After graduation Week 66

This is where conditional decisions become real and the final school choice becomes concrete.

Main action

File Germany, Austria, or any route that only becomes clean once final documents exist.

Support

Treat July international deadlines as immovable.

Deliverable

After-graduation applications filed on time.

66
Jun 28-Jul 4, 2027

Compare offers seriously

Upcoming
Phase · After graduation Week 67

This is where conditional decisions become real and the final school choice becomes concrete.

Main action

Review offers against scholarship value, total cost, country fit, and first-job logic.

Support

Write a decision memo before making the final acceptance call.

Deliverable

One defendable offer-ranking sheet.

67
July 2027
Jul 5-11, 2027

Upload the final school proofs

Upcoming
Phase · After graduation Week 68

This is where conditional decisions become real and the final school choice becomes concrete.

Main action

Send final transcripts, graduation proof, and any cleared conditions to the active schools.

Support

Check upload confirmation instead of assuming receipt.

Deliverable

Conditional offers moved toward final status.

68
Jul 12-18, 2027

Finish after-graduation routes

Upcoming
Phase · After graduation Week 69

This is where conditional decisions become real and the final school choice becomes concrete.

Main action

File Germany, Austria, or any route that only becomes clean once final documents exist.

Support

Treat July international deadlines as immovable.

Deliverable

After-graduation applications filed on time.

Milestone
Germany deadline week

International July-gate routes should be closed this week.

69
Jul 19-25, 2027

Compare offers seriously

Upcoming
Phase · After graduation Week 70

This is where conditional decisions become real and the final school choice becomes concrete.

Main action

Review offers against scholarship value, total cost, country fit, and first-job logic.

Support

Write a decision memo before making the final acceptance call.

Deliverable

One defendable offer-ranking sheet.

Milestone
Decision memo

The family should be close to one ranked final choice now.

70
Jul 26-Aug 1, 2027

Accept the final offer

Upcoming
Phase · Admission secured Week 71

The plan ends when one destination is genuinely secured, not merely hoped for.

Main action

Commit to one school, complete any deposit or confirmation step, and archive the acceptance proof.

Support

Immediately drop non-winning lanes once the final choice is confirmed.

Deliverable

One accepted destination with written proof.

71
August 2027
Aug 2-8, 2027

Hand off into pre-arrival work

Upcoming
Phase · Admission secured Week 72

The plan ends when one destination is genuinely secured, not merely hoped for.

Main action

Package the next visa, housing, and arrival steps so admission moves into execution cleanly.

Support

Treat this as a transition checkpoint, not the end of all work.

Deliverable

A post-admission action file ready for the next stage.

Milestone
Admission secured

One school should now be fully chosen and operationally locked.

72

End point

This timeline deliberately stops when admission is secured. Visa, housing, deposit, and departure readiness continue after this page's final milestone.